res-ban

Resources

Equipment maintenance

We carry out regular maintenance on all production equipment, with three core objectives: ensuring machining accuracy and cutting scrap rates; extending the service life of key components to reduce replacement costs; and minimizing sudden shutdowns to guarantee efficient, uninterrupted production.


Frequency:Once a month

Coverage rate: 100% of production equipment

Qualified rate after maintenance: 95%

main1-1

Maintenance Period

Maintenance CycleCore Steps
Daily Maintenance (Per Shift/Daily)

1.Cleaning: Wipe the machine worktable, guide rail surface and spindle end face to remove iron chips and cutting fluid residues.

2.Inspection: Check cutting fluid level, lubricating oil level and confirm normal pressure.

3.Recording: Fill in the daily maintenance record form and mark abnormal conditions (e.g., insufficient fluid level, abnormal noise).

4.Shutdown: Turn off the machine power supply and cut off the air source in accordance with standard procedures.

Weekly Maintenance

1.Deep Cleaning: Clean the coolscreen and dust inside the spindle

2.Fastening: inspect and tighter

g bolts(e.g.worktable.tool magazine)

3.lubrication: Refill special lubricating oil for quide rails and lead screws to ensure sufficient lubrication

4.Calibration: Perform simple calibr

ine zero point to quarantee machining accuracy.

Monthly/Quarterly Maintenance

1. Precision Testing: Test spindle runout and guide rail clearance, and record precision data.
2. Component Inspection: Check tool magazine positioning accuracy, hydraulic system tightness and electrical circuit aging status.
3. Consumable Replacement: Replace vulnerable consumables such as cutting fluid and lubricating oil filter elements.
4. Comprehensive Commissioning: Adjust equipment operating parameters to eliminate potential faults.

Annual Overhaul

1.Disassemblv inspection, conduct dlisassembly testing of core components such as spinales, lead screws and gulde rcis.
2.Repair /Replacement: Repcir worn components and replace aging core parts (e.q, bearings, sealing rings.
3.Precision Calibration: Calibrate the machine geometric accuracy and positioning cccuracy with professional equipment.
4.Comprehensive Testing: Perform no-load operation + trial cuting to confirm that equipment performance meets standards.

Equipment maintenance records

Maintenance Case

Jirfine V-11 Equipment Maintenance Record
DateMaintenance ItemCore ContentMaintenance ResultCycle
2025-03-15Regular InspectionClean equipment body, check fastness of core                components, verify operating parametersStable operation, all parameters up to standardMonthly
2025-06-20Lubrication Maintenance

Inject special lubricant for transmission system  clean oil circuits

Smooth transmission,nojamming or abnormal noiseQuarterly
2025-09-12Precision Calibration

Calibrate positioning accuracy,test sensor

sensitivity

Precision meets +0.0lmm original standardSemi-annually
2025-12-08System MaintenanceCheck wear of key parts (motor, guide rail, etc.)Efficient response, good heat dissipationSemi-annually
2025-12-08

System Maintenance

Update control program, inspect circuit conne-ctions, clean cooling system

No abnormal wear, stable performanceAnnually
Maintenance Standards & Guarantees

Authentic Compliance: Strictly follows Jirfine’s original factory maintenance protocols, utilizing genuine brand-specific consumables and professional tools.

Traceable Accountability: Provides official inspection reports post-maintenance, with fully traceable records supporting after-sales verification.

Performance Enhancement: Extends equipment service life by over 30% while ensuring consistent high-efficiency operation.

main4-1
main4-2
main4-3
Before & After Maintenance

Before: Slight jamming of transmission components; positioning accuracy deviation of ±0.03mm.

After: Smooth, noise-free operation; precision restored to the original ±0.01mm standard.

Maintenance Team Qualifications

All technicians hold Jirfine’s official certification, mastering professional maintenance skills for precision equipment.

Average industry experience of 5+ years, with in-depth expertise in Jirfine product structures and operating systems.

Adhere to standardized maintenance processes, ensuring every operation meets original quality requirements.

Ready to Start Your Project?

Send us your drawings and receive a fast, professional quotation(in 24 hours).
Contact Us